verb
1. To proceed or perform in an unsteady, faltering manner.
2. To move about in an indolent or clumsy manner.
Do I need to explain?
I really hoped I would finish the back of my sweater yesterday. But that was delusional thinking. I had about 13 inches (?) done by bedtime on Wednesday night. I got to bind off a few stitches for the armholes at 15 inches then decrease for 11 rows. I thought this would speed things up. And it did but the back is 23.5 inches long. As of bedtime I was at 17 inches. If I work like a maniac today I might get it done. I was planning on a massive knitting all day event on Sunday but I'll be working instead.
Can I just do the back and the fronts and call it a vest?